Air Conditioning – Phase 2 Lobby


Air Conditioning – Phase 2 Lobby


A new air conditioning / heat pump was installed in the lobby of PH2 last week as the previous unit was impossible to maintain and no longer repairable. The unit is working, stronger and more efficient than the old unit. There is a bit more work to do to finalize the installation and we will be installing trees to camouflage the outside unit.