2016-07-10

Pool Update

Gutters

Two of 3 sets of gutters are installed. The last section should be complete by the end of the day Monday.

Other Repairs

There are a few areas that need a bit of epoxy repair. The two small pedestals that secure the main hand rails need to be demolished and rebuilt.

These repairs should occur early in the week.

Painting

Painting of the pool should begin this week. Once the pool paint is dry, we can refill the pool and go swimming.


We are still targeting the pool to be operational sometime during the last week of July.