We
were expecting 50 to 60 condos to need their balcony railings touched up. In
fact, the requests were more than double and we have more than 200 balconies to
do.
Painting
cannot be done when the temperature at night falls into the single digits.
We
considered supplementing the contractor with the supers as way to speed things
up but the fact is that we will run out of time and we will not be able to
complete the job. Therefore,
we are postponing painting the balcony railings until next spring.
After
one more winter, there will be even more railings to be done and have decided
to do all condos at that time. This
has the added benefit of reducing the unit cost per balcony.